Major Delays Between Miami and Burleigh as Light Rail Works Intensify

Coastal Congestion: Single-Lane Zones on Gold Coast Highway
Commuters heading through the central coastal corridor this Tuesday, 31 March, should allow for significant extra travel time. The ongoing construction of the Gold Coast Light Rail Stage 3 has reached an intensive phase between Miami and Burleigh Heads. The Gold Coast Highway is currently reduced to a single lane in both directions from Dawn Parade through to George Street East.
- A strictly enforced 40km/h work zone speed limit is in place for the safety of crews performing track slab installation and overhead wire stringing.
- Heavy bottlenecks are expected at the Christine Avenue and West Burleigh Road intersections during both morning and afternoon peaks.
- Traffic authorities strongly recommend using Bermuda Street as the primary north-south alternative to bypass the coastal crawl.
Northern Corridor and Coomera Connector Updates
In the city's north, the Coomera Connector Stage 1 project continues to impact local traffic patterns. Motorists are reminded that the bridge overpass at Ridgevale Drive remains fully closed as part of the 2026 bridge replacement program. Diversions are currently routed via the Smith Street Motorway, which is experiencing higher-than-usual traffic volumes as a result.
Additionally, those using the Smith Street Motorway off-ramp toward Southport should be aware of narrowed lanes and temporary speed reductions. These changes are necessary for essential pavement maintenance and will likely cause minor tailbacks during the morning rush. Please merge with care and follow all temporary signage.
Suburban Road Closures and Hinterland Alerts
Several local road rehabilitation projects are active across the region today, necessitating detours and changed conditions in the following areas:
- Labrador: Turpin Road remains closed to all through-traffic between First Avenue and Fourth Avenue for essential road rehabilitation. Detours are available via Brisbane Road.
- Mudgeeraba: Berrigans Road is closed between Gold Coast-Springbrook Road and Mark Way. Local residents are advised to use alternate access routes.
- Hinterland: Reconstruction efforts are ongoing on Gold Coast-Springbrook Road between Neranwood and Pine Creek Road. Motorists should expect "stop/slow" traffic control at multiple landslip remediation sites, with estimated wait times of approximately 10 minutes per site.
Public Transport and Service Adjustments
While train services on the Gold Coast line are running to a standard weekday timetable today, bus commuters in the southern precincts will face some adjustments. Due to the Light Rail construction, several bus stops in the Miami and Burleigh areas have been temporarily relocated. Passengers are encouraged to check the Translink journey planner or look for on-site signage before their trip. While major rail track closures are not scheduled for today, commuters should remain alert for minor delays due to ongoing network-wide infrastructure maintenance.

Storyfest Highlights and Cabaret Thrills: What’s On in Gold Coast Today

The Tuesday Brief: Rail Milestones, Literary Lunches, and the Easter Countdown

Public Notice Roundup: Official Council Advisories for Tuesday, 31 March 2026
